Groundwater Monitoring Systems for Bores and Wells

Telemetry2U connects compatible groundwater level loggers and water quality instruments to remote dashboards, alerts and historical records using LoRaWAN, NB-IoT or LTE-M. Monitor individual bores or distributed groundwater monitoring networks, with solar-powered telemetry and integration options for In-Situ Level TROLL and other suitable instruments.

Illustrative groundwater bore monitoring with a field technician, water monitoring instruments, remote dashboard displays and telemetry features.

Keep the Instrument. Add Remote Visibility.

Reduce routine data-download visits and make groundwater trends available to your team. Start with existing compatible loggers or select a complete integrated monitoring station.

Move Beyond Manual Groundwater Data Collection

Remote groundwater monitoring combines a suitable field instrument, a telemetry node and an online platform. Instead of waiting for the next site visit to download a logger, authorised users can review received readings and changes in groundwater conditions from a computer, tablet or phone.

Technician lowering a stainless-steel groundwater level logger into a cased monitoring bore at a remote field site

A Practical Extension to Existing Monitoring Programs

Environmental consultants, hydrogeologists and water managers often need regular measurements from bores spread across large areas. Remote telemetry complements instrument logging and manual reference measurements, helping teams prioritise visits and identify emerging changes.

  • Routine measurements: Collect readings automatically at configured intervals.
  • Groundwater trends: Review seasonal changes, recovery, drawdown and responses to rainfall or pumping.
  • Remote alerts: Notify nominated users when configured limits are reached.
  • Multiple locations: Compare measurements from individual bores in one account.
  • Retain local records: Continue instrument logging where supported and configured.
  • Reduce travel: Focus field visits on inspection, servicing, sampling and validation rather than routine downloads.

For surface-water storage, see our tank and dam level monitoring application.

See Groundwater Conditions Across Your Monitoring Network

Use dashboards to bring together the latest groundwater measurements, historical trends and communication status. The dashboard can be configured around individual bore IDs, monitoring programs and client sites.

Groundwater Monitoring Dashboard

Illustrative data
Illustrative Telemetry2U desktop and smartphone displays showing groundwater depth in metres, multi-bore reports, historical trends, temperature and conductivity.

Illustrative dashboard and report views with example data. Available measurements, widgets and reporting options depend on the selected instruments and configuration.

Current Readings, History and Notifications

Track the latest received measurements and investigate changes over time. Different sites and instruments can be displayed together with labels and units appropriate to each monitoring program.

  • Display water level, depth to water, temperature and other supported inputs.
  • Compare multiple bores and review historical trends.
  • Configure high and low limits, delayed alerts and missed-communication notifications.
  • Send enabled email, SMS or voice-call notifications to selected users.
  • Review battery and signal indicators where supported by the telemetry node.
  • Export data and generate reports for analysis or project records.

Remote visibility depends on reporting frequency and successful data delivery; the platform is not a substitute for field validation or critical local safeguards.

How Remote Groundwater Monitoring Works

The instrument, field interface, wireless connection and cloud platform are separate components. A compatible instrument can retain its own logging function while a telemetry node provides remote access to periodic measurements.

From the Bore to the Monitoring Team

STEP 1

Measure

A suitable water level logger measures pressure, temperature or other configured parameters within the bore.

STEP 2

Connect

A compatible surface telemetry node reads the instrument and sends measurements over the selected wireless network.

STEP 3

Visualise

Telemetry2U decodes the readings, displays them in engineering units and creates configured calculated values.

STEP 4

Respond

Review changes and notify the appropriate users when measurements or communication status meet configured conditions.

Groundwater Monitoring for Environmental, Council and Industrial Applications

From a single observation well to a distributed bore network, remote monitoring can support different groundwater programs without requiring every location to use the same instrument or wireless network.

Environmental and Public-Sector Programs

Groundwater Assessment and Resource Management

Monitor groundwater changes across distributed observation networks.


Environmental Consultants and Hydrogeologists

Collect routine measurements across client sites, review baseline conditions and investigate changes in aquifer behaviour.

Councils and Water Authorities

Track groundwater conditions around community assets, catchments, water supplies and observation networks.

Government and Research Programs

Maintain consistent records over long monitoring periods and compare bore responses to seasonal or environmental changes.

Contaminated Land and Remediation

Follow groundwater level changes alongside suitable water quality instruments and established sampling procedures.

Operational and Commercial Sites

Groundwater Extraction and Site Monitoring

Review groundwater behaviour in the context of site operations.


Agriculture and Water Supply

Track production and observation bores, pumping drawdown and recovery alongside water-use information.

Mining and Tailings Facilities

Monitor suitable groundwater observation bores near operational areas and tailings facilities as part of an assessed monitoring program.

Construction and Dewatering

Review changes in groundwater conditions during temporary works, subject to reporting and response requirements.

Landfills and Industrial Sites

Observe groundwater levels and selected water quality parameters around sites requiring ongoing environmental monitoring.

Integrating In-Situ Level TROLL and Other Groundwater Loggers

Choose instruments around the measurement range, accuracy, site conditions and monitoring objective. The In-Situ Level TROLL 400, 500 and 700 illustrate how specialist water level instruments can be combined with independent telemetry.

In-Situ Level TROLL 400 water level logger

Level TROLL 400

Non-Vented Level Logger

Measures absolute pressure and water temperature. Suitable for many long-term groundwater installations when the pressure range is selected correctly and barometric compensation is provided.

Consideration: Absolute pressure; independent barometric reference needed.

In-Situ Level TROLL 500 water level logger

Level TROLL 500

Vented Level Logger

Measures gauged water pressure and temperature using a vented cable that references atmospheric pressure. Select the correct cable and keep the vent path protected and dry.

Consideration: Vented configuration; cable and vent maintenance matter.

In-Situ Level TROLL 700 water level logger

Level TROLL 700

Flexible Level Logger

Available in vented and non-vented versions, with additional logging capabilities that can suit more specialised studies. The selected pressure range and output configuration determine the integration.

Consideration: Vented or non-vented; confirm exact instrument variant.

New Instruments or Retrofit Telemetry

In-Situ Level TROLL instruments provide a useful example of how compatible water level loggers can be integrated through SDI-12, or another supported interface where appropriate. The instrument can retain its separately configured internal log while the telemetry node reads and transmits current measurements.

Telemetry2U is not restricted to one instrument manufacturer. Other groundwater pressure sensors and loggers with compatible SDI-12, RS-485 Modbus or compatible analogue outputs such as 4–20 mA can be assessed for integration. Existing instrument models, cable terminations, outputs and power requirements should be checked first.

View the manufacturer’s Level TROLL specifications (PDF)

Turn Pressure Measurements into Meaningful Groundwater Levels

A submerged pressure sensor measures the pressure at its installed depth. To convert that measurement into useful groundwater information, the system needs the correct pressure reference, water density assumptions and installation reference.

Groundwater bore cross-section showing the bore reference, depth to water, water table, submerged pressure logger and conversion of corrected pressure into water head and groundwater level

Water Depth, Standing Water Level and Elevation

Telemetry2U Calculated Fields can derive additional values from one or more inputs available on the same node, using configured reference values and mathematical expressions.

  • Water head: Height of water above the submerged sensor.
  • Depth to water: Distance from a defined bore reference point to the water surface.
  • Water level elevation: Water surface elevation relative to a surveyed datum, such as metres AHD in Australia or the applicable local datum.
  • Other derived values: Engineering unit conversions and site-specific calculations using available inputs.

Why Barometric Compensation Matters

Non-vented loggers such as the Level TROLL 400 measure absolute pressure. To obtain accurate water head, atmospheric pressure must be removed using an appropriate time-aligned barometric reference. A fixed assumed atmospheric pressure is only an approximation. A vented logger normally references the atmosphere directly when correctly installed and maintained.

A barometric reading from a separate node is not automatically available to another node’s Calculated Fields. Where accurate compensation is required, the reference must be incorporated into the same node’s available inputs or handled through a suitable separately configured compensation workflow.

Sensor position, reference elevation, density and the calculation should be verified against field measurements before relying on derived levels.

Wireless Connectivity for Remote Groundwater Monitoring

Many monitoring bores are located away from mains power or a local internet connection. Choose the telemetry network around actual site coverage, reporting needs and instrument power demand rather than committing every site to one communications technology.

NB-IoT logo

NB-IoT
For Independent Fixed Monitoring Stations

NB-IoT can connect a compatible telemetry node directly to a cellular network, where supported by the local carrier and SIM.

  • No local gateway required.
  • Suitable for periodic measurements at fixed locations.
  • Check NB-IoT availability at each borehead.
LoRaWAN logo

LoRaWAN
For Groups of Bores and Local Networks

LoRaWAN can connect multiple nearby monitoring stations through a suitable gateway, including sites with an existing network.

  • Can serve multiple bores from one gateway within coverage.
  • Gateway requires power and internet backhaul.
  • Assess terrain, antenna height and local radio conditions.
LTE-M logo

LTE-M
For Dispersed Cellular Monitoring Sites

LTE-M connects compatible nodes directly to a carrier network and can suit sites that need more frequent communication.

  • No local gateway required.
  • Useful for geographically separated monitoring points.
  • Check carrier, SIM and regional LTE-M availability.

Different monitoring locations can use different networks in the same Telemetry2U account. Where suitable terrestrial coverage is unavailable, network or gateway coverage must be resolved before live telemetry can be relied upon.

Solar-Powered, Pre-Configured Bore Monitoring Stations

A typical remote installation combines a suitable submerged instrument, a cable to the borehead and an above-ground telemetry node. Hardware can be selected and configured before dispatch to simplify site installation.

Illustrative solar-powered groundwater monitoring station with an adjustable black star picket mount, borehead and In-Situ Level TROLL sensor

Designed Around the Monitoring Location

Solar-powered interfaces can supply external power to compatible instruments and read their outputs at configured intervals. Battery or mains-powered options may suit other installation conditions. The correct power budget depends on the sensor, reporting interval, network performance and available sunlight.

  • Pre-programmed nodes: Configure supported instrument communications, payload decoding and network settings before delivery.
  • Suitable installation hardware: Select cable length, mounting, weatherproof connections and strain relief for each bore.
  • Independent bore stations: A node per bore can simplify distributed deployments and limit the effect of a single node failure.
  • Flexible reporting: Configure intervals around the project and the available power and network.
  • Field commissioning: Confirm sensor depth, reference measurements, correct units and successful transmission before relying on the data.

Local logging can run at a different interval from telemetry. Data stored on the instrument remains separate unless historical data retrieval has been specifically integrated.

Expand Groundwater Monitoring into a Wider Environmental Network

Groundwater levels rarely tell the whole story. Telemetry2U can bring data from different compatible sensors and manufacturers into a single monitoring account, so the network can grow around the measurements required by the program.


Water Quality

Combine compatible conductivity, salinity, pH, dissolved oxygen, temperature and other water-quality instruments with groundwater measurements.


Rainfall, Flow and Weather

Add suitable rain gauges, flow meters and weather sensors to review conditions that may help explain changes in groundwater level.


Surface Water and Storage

Monitor tanks, dams, reservoirs and related water infrastructure from the same account, alongside groundwater observation and production bores.

A Complete Integrated Groundwater Monitoring Solution with Imbros

Telemetry2U works closely with Imbros to bring specialist instrumentation and remote monitoring together. Start with an existing compatible logger or discuss a complete new monitoring system, with Australian technical expertise supporting local and international projects.

Instrumentation and Field Hardware

  • Instrument selection: Work with Imbros to identify appropriate groundwater loggers, pressure ranges and cable requirements.
  • Retrofit assessment: Confirm whether existing instruments can be connected through a compatible interface.
  • Field accessories: Select suitable connectors, cables, enclosures and mounting hardware.

Telemetry and Platform Integration

  • Pre-configured telemetry: Supply programmed nodes ready for connection to the agreed instrument and network.
  • Platform configuration: Set up device inputs, units, calculated fields, dashboards and configured notifications.
  • Ongoing flexibility: Add monitoring points, compatible instruments and users as the program develops.

What We Need to Scope Your Project

Tell us which instruments you have or plan to purchase, the number and locations of the bores, cable lengths, expected water depths, desired reporting interval and how the groundwater level is referenced. We can then assess the hardware, connectivity and compensation approach.

The aim is a plug-and-play telemetry connection after configuration, with site-specific installation, network checks and measurement validation still required.

Groundwater Monitoring Frequently Asked Questions

Common questions about borehole telemetry, instrument compatibility, water level calculations, network coverage and remote monitoring system design.

Remote groundwater monitoring uses a suitable water level sensor or data logger, a telemetry interface and a communications network to send groundwater measurements to an online platform. Telemetry2U displays received readings, historical trends and configured alerts so users can review conditions without travelling to every bore to collect data.

Yes, compatible Level TROLL 400, 500 and 700 instruments can be considered for retrofit telemetry using a suitable interface such as SDI-12. The exact model, cable, output settings and power requirements must be confirmed before the telemetry hardware is configured.

An absolute (non-vented) pressure logger, such as the Level TROLL 400, measures both atmospheric pressure and water pressure. Accurate water level calculations require a suitable time-aligned barometric reference. A vented (gauged) sensor references the atmosphere through its vented cable and normally does not require separate atmospheric subtraction when installed and maintained correctly.

Yes. Calculated Fields can derive additional values from inputs available on the same node. With appropriate compensated pressure or water-head measurements, sensor installation depth and a known reference elevation, the platform can calculate depth below the bore reference and water level elevation. The calculation and reference values must be verified for each installation.

Yes. A suitably sized solar-powered telemetry node can operate at a bore without mains power. Instrument power demand, reporting interval, communications performance, sunlight and seasonal conditions determine the appropriate power system.

An absolute or vented logger with its internal recording enabled can continue logging locally within its power and storage limits. Telemetry2U can issue a configured missed-communication alert when expected transmissions stop. Local logger records are retrieved separately unless historical data recovery has been specifically integrated; automatic cloud backfill is not assumed.

Yes. Multiple compatible monitoring stations can be organised in one Telemetry2U account with dashboards, charts and alerts. Separate telemetry nodes can be used at individual bores, or a shared interface can be assessed where instruments and site layout permit.

Yes. Compatible instruments can add water temperature, conductivity, salinity, pH, dissolved oxygen and other parameters. Rainfall, weather, flow and pump status can also be added using appropriate devices. Available readings depend on the instruments, interfaces and installation selected.

Reporting intervals are selected to suit the monitoring program, instrument, network and power budget. For example, periodic reporting every 15, 30 or 60 minutes may suit many long-term monitoring applications, while specialist tests may require faster local logging or a different telemetry design. Dashboards update as new readings arrive.

Telemetry2U works closely with Imbros to help select instruments, cables and accessories, supply compatible pre-programmed telemetry hardware and configure the cloud platform, data inputs, dashboards and alerts. Existing instruments can also be assessed for integration. Coverage and site installation requirements must be confirmed before commissioning.